Cost Centre is not replicated in Ref1.
Part of production feedback part 3
This should be addressed. Georgi please confirm sign-off.
Following the 5-15 update the cost center will be populated to memo / reference after selecting a carrier.
In general memo / reference logic fires after carrier selection.
This should be addressed. Georgi please confirm sign-off.
Following the 5-15 update the cost center will be populated to memo / reference after selecting a carrier.
In general memo / reference logic fires after carrier selection.